Mine Startup - New Gold Rainy River Mine
Location: Chapple, ON
Description:
Peat Extraction
Excavate and haul 1.25 M cubic metres of basal till, peat, and clay from open pit during preliminary stages of mine operation.
Stockpiling, ditching, and construction of ramps for pit access.
Civil Work and Construction
Culverts and access roads
Excavation and hauling
Pipeline installation: 22 km of HDPE piping, above- and below-ground
Fibre Optic cable installation
Aggregate Production
Blasting, Crushing, stockpiling, and loading 1.5 M cubic metres of aggregate for mine site civil construction
Value: >$53.5 M
Completion Date: September 2017