Mine Startup - New Gold Rainy River Mine

Location: Chapple, ON


Description:

  • Peat Extraction

  • Excavate and haul 1.25 M cubic metres of basal till, peat, and clay from open pit during preliminary stages of mine operation.

  • Stockpiling, ditching, and construction of ramps for pit access.

  • Civil Work and Construction

  • Culverts and access roads

  • Excavation and hauling

  • Pipeline installation: 22 km of HDPE piping, above- and below-ground

  • Fibre Optic cable installation

  • Aggregate Production

  • Blasting, Crushing, stockpiling, and loading 1.5 M cubic metres of aggregate for mine site civil construction


Value: >$53.5 M


Completion Date: September 2017


Owner: New Gold Inc.